• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Lee L. Lowery, Jr., PhD, P.E.
  • Research
  • People
  • Contact

Lee L. Lowery, Jr.

Just another CoE WordPress site

Texas A&M University College of Engineering

5.18b

Posted on July 27, 2021 by Abigail Stason

     MOR/LP
Date: 11/14/10                                   Time: 11:41:23
                    C:\PROGRA~3\MOR\5-18b.lp
                        MODEL DESCRIPTION
      ****************************************************
"Problem 5-18b: Run paper factory to get minimum total run time - i.e. a+b"

 Min Z = a + b

 st 
 8a+2b>=16  "This makes enough low grade paper."
 a+b>=5     "This makes enough medium grade paper."
 2a+7b>=20  "This makes enough high grade paper."

1000a + 2000b - Totalcost = 0 "Check for total cost"
a + b - Totalruntime = 0         "Calculate total time factories ran"

"Note that the total cost will be 1000a + 2000b"
"Note that the total time the plants will run = a+b"
"Note that the delivery time will be the larger of a or b"
      ****************************************************
Simplex Method
    ^^^ Optimal Solution ^^^

Z               =      5.0000
A               =      1.0000
B               =      4.0000
TOTALCOST       =   9000.0000
TOTALRUNTIME    =      5.0000
 Surpl3         =     10.0000


Compile time:     0.00 (Secs.)
Run time    :     0.00 (Secs.)

Filed Under: Uncategorized

Pages

  • Contact
  • Lee L. Lowery, Jr., PhD, P.E.
  • Office Hours

© 2016–2023 Lee L. Lowery, Jr. Log in

Texas A&M Engineering Experiment Station Logo
  • College of Engineering
  • Facebook
  • Twitter
  • State of Texas
  • Open Records
  • Risk, Fraud & Misconduct Hotline
  • Statewide Search
  • Site Links & Policies
  • Accommodations
  • Environmental Health, Safety & Security
  • Employment