• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Lee L. Lowery, Jr., PhD, P.E.
  • Research
  • People
  • Contact

Lee L. Lowery, Jr.

Just another CoE WordPress site

Texas A&M University College of Engineering

Problem: 5-10

Posted on July 27, 2021 by Abigail Stason

Given the following information:

Project Requirements (truckloads/week): A needs 45, B needs 50, C needs 20.
Plant Production (truckloads/week): W makes 35, X makes 40, Y makes 40.

Transportation Costs:

To Project A

To Project B

To Project C

From Plant W

$5/truckload

$10/truckload

$10/truckload

From Plant X

$20/truckload

$30/truckload

$20/truckload

From Plant Y

$5/truckload

$8/truckload

$12/truckload

Required: Determine the minimum transportation costs for supplying each project.

Filed Under: Uncategorized

Pages

  • Contact
  • Lee L. Lowery, Jr., PhD, P.E.
  • Office Hours

© 2016–2023 Lee L. Lowery, Jr. Log in

Texas A&M Engineering Experiment Station Logo
  • College of Engineering
  • Facebook
  • Twitter
  • State of Texas
  • Open Records
  • Risk, Fraud & Misconduct Hotline
  • Statewide Search
  • Site Links & Policies
  • Accommodations
  • Environmental Health, Safety & Security
  • Employment