• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Lee L. Lowery, Jr., PhD, P.E.
  • Research
  • People
  • Contact

Lee L. Lowery, Jr.

Just another CoE WordPress site

Texas A&M University College of Engineering

Time independent production models

Posted on July 27, 2021 by Abigail Stason

Print out the following page and bring it to class with you.

Time Independent Production Models

Determine what scaffolding components to make for the following month, given the data below:

  Side Rails Floors Braces Connections Limits/month
Ft of 2” Pipe Used 50 ft 20 ft 10 ft   50,000 ft
Ft of 2x2x1/4” Angle Iron Used 30 ft 50ft 12 ft 8 ft 30,000
1” bolts 20 30   4 10,000
Pounds of Welding 2 1 4 3 1,000
Labor 10 6 2 1 3200
Profit $80 $50 $12 $8  
Minimum Required 30   50    

Additionally, marketing requires that you make at least 2 sides for every floor manufactured.

Filed Under: Uncategorized

Pages

  • Contact
  • Lee L. Lowery, Jr., PhD, P.E.
  • Office Hours

© 2016–2025 Lee L. Lowery, Jr. Log in

Texas A&M Engineering Experiment Station Logo
  • College of Engineering
  • Facebook
  • Twitter
  • State of Texas
  • Open Records
  • Risk, Fraud & Misconduct Hotline
  • Statewide Search
  • Site Links & Policies
  • Accommodations
  • Environmental Health, Safety & Security
  • Employment