• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Lee L. Lowery, Jr., PhD, P.E.
  • Research
  • People
  • Contact

Lee L. Lowery, Jr.

Just another CoE WordPress site

Texas A&M University College of Engineering

Hauling dirt simulation by hand

Posted on July 28, 2021 by Abigail Stason

For the dirt hauling system shown perform a hand simulation.  Large truck size = 27 to 33 cy, small truck size = 19 to 21 cy, both normally distributed.  Time distributions shown are in minutes and are the same for both trucks.

Clock Time Entity Under Discussion Where is the Entity? What Operation Is Being Performed? Random Number Used for Simulation Probable Time Required for Operation Time Operation can Begin Time At End of Operation Random  Number Used for Load Size Load Size Total Dirt Hauled

Filed Under: Uncategorized

Pages

  • Contact
  • Lee L. Lowery, Jr., PhD, P.E.
  • Office Hours

© 2016–2025 Lee L. Lowery, Jr. Log in

Texas A&M Engineering Experiment Station Logo
  • College of Engineering
  • Facebook
  • Twitter
  • State of Texas
  • Open Records
  • Risk, Fraud & Misconduct Hotline
  • Statewide Search
  • Site Links & Policies
  • Accommodations
  • Environmental Health, Safety & Security
  • Employment