Print out this page and bring it to class with you.
A contractor wants to hire various sub-contractors to work for him on a job. Each of the subs have tendered the sealed bids as follows:
Job Part | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | Cost | Special conditions |
Bid ID | ||||||||||
A1 | Y | Y | Y | Y | 8 | None | ||||
A2 | Y | Y | Y | Y | 10 | |||||
A3 | Y | Y | Y | Y | Y | Y | Y | Y | 16 | |
B1 | Y | Y | Y | 4 | Brother-in-law (at least one job) and minority contractor (10%) | |||||
B2 | Y | Y | 5 | |||||||
C1 | Y | Y | 2 | Small contractor with small work force (maximum 2 jobs) | ||||||
C2 | Y | Y | Y | 3 | ||||||
C3 | Y | Y | Y | 2 | ||||||
C4 | Y | Y | Y | Y | Y | 4 | ||||
D1 | Y | Y | 3 | Minority contractor (minorities must get at least 10% of award) | ||||||
D2 | Y | Y | Y | 5 | ||||||
E1 | Y | Y | Y | Y | 10 | New contractor (maximum bond – $18) | ||||
E2 | Y | Y | 6 | |||||||
E3 | Y | Y | Y | 8 |
A different problem, unrelated to the previous problem:
Job Part | 1 | 2 | 3 | Cost |
Bid ID | ||||
A | Y | Y | Y | 20 |
B | Y | Y | 6 | |
C | Y | Y | 8 |