• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Lee L. Lowery, Jr., PhD, P.E.
  • Research
  • People
  • Contact

Lee L. Lowery, Jr.

Just another CoE WordPress site

Texas A&M University College of Engineering

Subcontractor Bids

Posted on July 28, 2021 by Abigail Stason

Print out this page and bring it to class with you.

A contractor wants to hire various sub-contractors to work for him on a job. Each of the subs have tendered the sealed bids as follows:

Job Part 1 2 3 4 5 6 7 8 Cost Special conditions
Bid ID
A1 Y Y Y Y 8 None
A2 Y Y Y Y 10
A3 Y Y Y Y Y Y Y Y 16
B1 Y Y Y 4 Brother-in-law (at least one job) and minority contractor (10%)
B2 Y Y 5
C1 Y Y 2 Small contractor with small work force (maximum 2 jobs)
C2 Y Y Y 3
C3 Y Y Y 2
C4 Y Y Y Y Y 4
D1 Y Y 3 Minority contractor (minorities must get at least 10% of award)
D2 Y Y Y 5
E1 Y Y Y Y 10 New contractor (maximum bond – $18)
E2 Y Y 6
E3 Y Y Y 8

A different problem, unrelated to the previous problem:

Job Part 1 2 3 Cost
Bid ID
A Y Y Y 20
B Y Y 6
C Y Y 8

Filed Under: Uncategorized

Pages

  • Contact
  • Lee L. Lowery, Jr., PhD, P.E.
  • Office Hours

© 2016–2025 Lee L. Lowery, Jr. Log in

Texas A&M Engineering Experiment Station Logo
  • College of Engineering
  • Facebook
  • Twitter
  • State of Texas
  • Open Records
  • Risk, Fraud & Misconduct Hotline
  • Statewide Search
  • Site Links & Policies
  • Accommodations
  • Environmental Health, Safety & Security
  • Employment